- Set of guide lines which describes test design for the project
- Can be either on organization level prepared by QA Manager/Director OR on project level prepared by QA Manger/Lead
- Pre-requisite for this document is Business Requirement Document (BRD)
- Often a static document i.e. not much changes happen in this document during the project life cycle
- Contain generic information about what should be covered/used as testing. Few key points can be (Not limited to)-
- Business scope & objective
- QA Best Practices
- Test Automation tools (Used at organization level OR Proposed for the project)
- Defect Management tools (Used at organization level OR Proposed for the project)
- Change & configuration management tool (Used at organization level OR Proposed for the project)
- Test Deliverables
- Test status communication
- Test metrics reporting
- Training requirements
Test Plan
- Details out test methodology for a particular project release or phase
- Prepared by QA Manager or QA Lead
- Pre-requisite for a Test plan is Business Requirement Document (FRD) Or Software requirement specification (SRS)
- Mostly a dynamic document where changes can happen during release cycle and all these changes are tracked in a different version e.g. There can be certain features which can be discovered as out of scope in the current release due to ANY reason. Such features should be scoped out from QA perspective as well in the Test plan
- Can contain following information (Not limited to)
- Feature/Release introduction
- Features in scope
- Features not is scope
- Entry/Exit/Resumption Criteria
- Testing in/out scope, can be a combination of functional / non- functional testing
- Functional Testing
- Unit
- Integration
- System
- UAT
- DB Testing
- Non-functional Testing
- Performance
- Load
- Stress
- Schedule & responsibilities
- Test tools (Used in the particular release based on the consent with client or group)
- Automation tools
- Defect Management tool
- Change & configuration management tool
- Test data strategy
- Test Scenarios/ Test Case
- Test Environments
- Test Deliverables
- Test Plan
- Test Cases
- Test Results
- Test Status/Report (Daily/Weekly)
- User document
- Test Sign-off report
- Risks & contingencies
- Test plan Approvals
No comments:
Post a Comment